Electrical work order for an EV charger install.
The customer bought a 48-amp wall charger and wants it in the garage by Friday. The electrician needs the panel info from the site visit, the wire run, what to check before energizing, and a reminder to photograph everything before it's covered.
Work order
| Item | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| Check: load calculation on existing 200A panel Done at the site visit, confirm nothing's been added since | 1 | check | $0.00 | $0.00 |
| 60A 2-pole breaker Match panel make: [make] | 1 | each | $85.00 | $85.00 |
| 6 AWG copper, panel to charger Measured run [number] ft plus slack | 45 | linear ft | $8.50 | $382.50 |
| Conduit, straps and fittings, garage wall | 20 | linear ft | $6.00 | $120.00 |
| Mount and terminate charger Customer-supplied unit, set to 48A in its settings | 1 | each | $225.00 | $225.00 |
| Permit and inspection No. [number] | 1 | each | $150.00 | $150.00 |
| Check: torque terminals to the manufacturer's spec | 1 | check | $0.00 | $0.00 |
| Check: test charge with the customer's car | 1 | check | $0.00 | $0.00 |
| Photos: panel, wire run and terminations before covers go on | 1 | set | $0.00 | $0.00 |
Click any text to change it. Rates and the tax rate are examples, so put in your own. Totals update as you type.
What this template covers
- The load calc from the site visit carried onto the sheet, so nobody installs into a panel that can't take it
- Wire and conduit by the linear foot, breaker and termination by the each
- Check: lines for torque and a real test charge with the car
- Photos before covers go on, for the inspector and for your own records
- A clear stop rule when the panel doesn't match what was sold
Doing it in Redline
In the tech app, every job's checklist starts with before photos and ends with after photos, and the job's notes (panel make, open spaces, where the charger goes) show on the electrician's phone as office notes. On Team ($129 a month for 3 seats), dispatch it by chat and it's on his Today screen with one-tap call to the customer when he pulls in.
"Remind me Thursday to confirm the Natarajan inspection" lands in that morning's push on the iPhone app. Once he marks it done, the job sits in Ready to bill and the invoice goes out as a card pay link on Solo or up. Redline doesn't schedule the inspector or track permits as their own records, so keep the permit number in the notes. More in electrical estimating and the electrical invoice template.
Photos, notes and the job, on his phone.
Redline is free to start. The tech app and dispatch are on Team.
Keep reading
- Work order templateThe tech's copy: scope, checklist with quantities, parts, access, sign-off.
- Electrical change order templatePanel upgrade: SE cable, AFCI breakers, grounding, a declined add credited.
- Electrical invoice templateEV charger install with breaker, wire per foot, permit and deposit credit.
- Electrical softwareQuote panel upgrades and EV chargers by the device, and bill the small jobs too.