Roofing estimate template, by the square.
Measure the roof, fill in the squares and the edges, and the totals and the deposit work themselves out. Click any text to edit it.
Estimate
| Item | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| Tear-off, existing shingles 1 layer found at inspection | 22 | square | $75.00 | $1,650.00 |
| Architectural shingles, installed Color chosen at signing | 24 | square | $320.00 | $7,680.00 |
| Synthetic underlayment | 24 | square | $28.00 | $672.00 |
| Ice and water shield Eaves, valleys and around penetrations | 5 | square | $95.00 | $475.00 |
| Drip edge and starter strip | 165 | linear ft | $4.25 | $701.25 |
| Ridge vent | 38 | linear ft | $12.00 | $456.00 |
| Pipe boots | 3 | each | $45.00 | $135.00 |
| Decking allowance Extra sheets billed as found | 3 | sheet | $95.00 | $285.00 |
| Dumpster, permit and cleanup | 1 | job | $640.00 | $640.00 |
Click any text to change it. Rates and the tax rate are examples, so put in your own. Totals update as you type.
Why it's laid out this way
- Everything that scales with the roof is per square, so a bigger roof is just a new quantity
- Tear-off is its own line because the number of layers changes the price
- A decking allowance keeps surprises off the final invoice
- The deposit is worked out from the total, ready for the signing visit
Or build it by chat
In Redline, tell the chat "quote Maria Lopez: 24 squares architectural, 1 layer tear-off, 30% deposit", or send a photo from the roof, and it builds the itemized estimate with the deposit. Check it, adjust it, and it's saved on her file next to the job.
For good, better and best options, the quote composer in Money (Solo) lays them out side by side. See how roofing estimates in Redline work, or check your numbers first with the markup vs margin calculator.
Your next estimate, built by chat.
Redline is free to start. Describe the roof and it lays out the lines.
