Plumbing change order for what's behind the wall.

You open the wall to run PEX and find the cast iron stack cracked from the last owner's settling. It has to be fixed while the wall's open. This form prices it, adds the extra openings it takes, and says who closes them up.

Change order

Change order CO-2
Your Plumbing Co.
Street address, City, ST
Phone · email
License no. (if your trade needs one)
Prepared forLinda OkaforJob address
JobWhole-house PEX repipe, change order 1
DateDate
ItemQtyUnitRateAmount
Add: replace cracked cast iron drain section with PVC
Includes no-hub couplings and riser clamp
6linear ft$95.00$570.00
Add: extra wall openings for access
Hall bath and kitchen, about 14 x 24 in. each
3each$120.00$360.00
Add: replace seized main shutoff with full-port ball valve
Old gate valve wouldn't close fully
1each$245.00$245.00
Credit: exterior hose bib replacement
Customer keeping the existing frost-free bibs
-2each$140.00-$280.00
Subtotal$895.00
Tax (6.25%)$55.94
Change order total$950.94
Reason for change: cracked cast iron found in the hall bath wall when it was opened for the repipe on [date] (photo attached). The main shutoff would not close fully during water-off. Customer chose to keep the existing hose bibs.
Openings are left framed and clean. Drywall patching and paint are not included unless added here: [ ].
Water and drains are off for [number] hours on [date] while the stack is cut in.
Payment: added to the final balance.
Customer: ______________________ Date: ________ Plumber: ______________________ Date: ________
Track every job in Redline

Click any text to change it. Rates and the tax rate are examples, so put in your own. Totals update as you type.

What this template covers

  • Pipe by the linear foot, valves and openings by the each, the way plumbers price found work
  • The hidden condition and the photo that proves it, named in the reason line
  • Who patches the openings, the question that causes the most trouble at the end of a repipe
  • When the water and drains will be off, so the customer can plan the day
  • A credit for part of the original scope the customer dropped

Doing it in Redline

Photo of the crack, then "change order for Okafor: 6 ft cast iron to PVC at $95, three openings at $120, main shutoff $245." Redline builds it as a quote on her file. If you're not sure what the stack section will cost at the supply house, ask the chat to look up current prices first. Web lookups use AI credits like everything else in the chat.

She signs this form on site since Redline doesn't take signatures. Snap the supply house receipt in Money, Expenses, file it to the Okafor job, and Reports shows what the repipe really made once the change is billed. Expenses and invoicing are on Solo, $29 a month. If you run trucks, the plumbing dispatch page shows how jobs get to the crew.

Price it while the wall is open.