Redline
Free template

Fence invoice template, by the foot.

Footage, posts and gates on their own lines, the ledge you hit on its own line, and the deposit already taken off. Click any field to change it.

Invoice

No. 1042
Your Fence Co.
Street address, City, ST
Phone · email
License no. (if your trade needs one)
Bill toGreg TanakaJob address
Job150 ft of 6 ft cedar privacy fence, walk gate and drive gate
Date · DueDate issued · Due in 14 days
ItemQtyUnitRateAmount
Old fence removal and haul-away
Stockade, back and side lines
140linear ft$4.00$560.00
6 ft cedar privacy fence, installed
Dog-ear pickets, 3 rails
150linear ft$28.00$4,200.00
Posts set in concrete
4x4 pressure-treated, below frost line
21each$42.00$882.00
Concrete42bag$9.00$378.00
Walk gate, 4 ft
With latch and spring closer
1each$425.00$425.00
Double drive gate, 10 ft
With cane bolt and drop rod
1each$1150.00$1,150.00
Post caps21each$12.00$252.00
Rock digging surcharge
Ledge hit at 6 post holes, shown to owner on site
6hole$65.00$390.00
Fence permit1each$75.00$75.00
Subtotal$8,312.00
Tax (6.25%)$519.50
Total$8,831.50
Less deposit paid-$3000.00
Balance due$5,831.50
Balance due on completion. The $3,000 deposit paid at signing is taken off above.
Fence set on the line the owner marked or the survey provided. The property line is the owner's responsibility.
Utility marks requested through 811 before digging. Private lines (sprinklers, pet fence wire, lamp posts) were the owner's to flag.
Workmanship warranty: put your terms here. Cedar weathers to gray and can check, which isn't a defect.

Click any text to change it. Rates and the tax rate are examples, so put in your own. Totals update as you type.

What this template covers

  • Fence by the linear foot, with posts, caps and concrete counted so the materials match the job
  • Each gate as its own line, since a drive gate and a walk gate price nothing alike
  • A rock and root surcharge per hole, so ledge shows up as what it was, not a mystery bump
  • Removal of the old run by the foot, and the permit fee at cost
  • The material deposit taken off after tax, leaving the right balance

Skip the template next time

In Redline you'd say "invoice Tanaka $5,831.50, fence balance after the $3,000 deposit" and it drafts the invoice from the job already on his file as one amount with a one-line description. Keep this sheet for the rock holes and gates itemized. You check it, approve it, then copy the card pay link from the invoice in Money into a message or an email from your own Gmail.

If the balance sits, Redline flags it at day 3, 7 and 14 and tells you who to call. It won't chase the customer on its own. Invoicing is on the Solo plan, $29 a month with a 7-day free trial. See invoicing or the fencing software page.

Bill the fence while the crew loads the truck.

Start free, add Solo when the first fence is done. Customers pay the balance by card, on your own Stripe account.

Keep reading