Painting change order for "actually, can we try the other gray?"

First coat's on the living room and it reads too blue in the afternoon light. The customer picks a new color, which means another full coat you didn't price. Write it up before you open the new can.

Change order

Change order CO-2
Your Painting Co.
Street address, City, ST
Phone · email
License no. (if your trade needs one)
Prepared forAlicia BrennanJob address
JobInterior repaint, first floor, change order 1
DateDate
ItemQtyUnitRateAmount
Add: extra coat, living room walls
Color changed after first coat from [Color A] to [Color B]
420sq ft$0.85$357.00
Add: ceiling stain, stain-blocking primer and patch
Old water stain under the bath, dry at time of work
1each$185.00$185.00
Add: paint two closet interiors
Walls, shelf and door, customer request
2each$140.00$280.00
Credit: hallway ceiling
Removed from scope
-1each$220.00-$220.00
Subtotal$602.00
Tax (6.25%)$37.63
Change order total$639.63
Reason for change: customer changed the living room color after seeing the first coat on [date]. Ceiling stain found during prep; moisture reading was dry, so it was primed and painted, not repaired. Closets added and hallway ceiling dropped at the customer's request.
Paint for the new color: [number] gallons of [Product, Sheen], included in the price above. Leftover paint of the first color stays with the customer.
If the stain comes back, the leak above needs a plumber before we repaint it.
Schedule: adds 1 day. Payment: added to the balance due at the final walkthrough.
Customer: ______________________ Date: ________ Painter: ______________________ Date: ________
Track every job in Redline

Click any text to change it. Rates and the tax rate are examples, so put in your own. Totals update as you type.

What this template covers

  • An extra coat by the sq ft of wall, the same way the room was estimated
  • Both colors written on the form, product and sheen included, so the next touch-up uses the right can
  • A stain-block line that says what you did and what you didn't fix
  • Rooms or surfaces added and dropped, by the each
  • One more day on the schedule, stated up front

Doing it in Redline

Tell the chat "Brennan changed the living room color, extra coat on 420 sq ft at $0.85, plus two closets at $140" and it builds the change as a quote on her file. Put the new color code and sheen in the job's notes, too. On Team ($129 a month for 3 seats), those notes show up on your painters' phones as office notes in the tech app, so nobody rolls the old color on the dining room.

Redline doesn't take signatures, so have her sign the form before the second coat. When the walkthrough's done, invoice the new total by chat as a card pay link on Solo ($29 a month). If you want to check how the extra day hits your margin, the job profit calculator does the math, and painting estimates shows how the original quote gets built.

Write the color down, then bill the coat.

Redline is free to start. One message builds the change and keeps the color on the job.