Drywall invoice template, ready for paint.
Hang and finish by the square foot, the finish level written down, and the extra trip when the mud wasn't dry. Change the numbers and print it.
Invoice
| Item | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| Remove wet drywall and insulation | 280 | sq ft | $1.25 | $350.00 |
| Hang drywall, 1/2 in. | 280 | sq ft | $1.60 | $448.00 |
| Tape and finish, level 4 | 280 | sq ft | $1.50 | $420.00 |
| Corner bead | 24 | linear ft | $3.00 | $72.00 |
| Knockdown texture, matched to existing ceiling | 120 | sq ft | $1.75 | $210.00 |
| Extra coat and return trip Humidity slowed drying | 1 | each | $125.00 | $125.00 |
| Debris removal | 1 | flat | $150.00 | $150.00 |
Click any text to change it. Rates and the tax rate are examples, so put in your own. Totals update as you type.
What this template covers
- Tear-out, hang and finish, each per sq ft of the same area
- The finish level written into the line, so expectations are set
- Corner bead per linear ft and texture per sq ft
- A return trip line for extra coats
- Moisture, paint and texture match in the terms
Skip the template next time
In Redline you say "invoice Ramirez $1,885.94 for the kitchen ceiling and wall repair" and it drafts the invoice on his file as one amount with a one-line description. Approve it, then copy the pay link from the invoice in Money and paste it into a message or email to him, and he pays by card.
Invoicing is on the Solo plan, $29 a month with a 7-day free trial. If you sub to GCs, add the GC as the contact and invoice them the same way. See invoicing.
Invoice before the mud is dry.
Start free and turn on invoicing when you're ready. Card payments go to your own Stripe account.
Keep reading
- Drywall estimate templatePopcorn removal: asbestos test, scrape, skim, prime, protection, debris.
- Drywall softwareBook trips around drying time, quote by finish level and chase slow-paying GCs.
- Invoicing and card paymentsInvoice from the job in two taps or one message. Customers pay by card.
- Job profit calculatorSee what a job really makes after materials, labor and overhead.
