Deck change order for the upgrade after the footings.

The frame is up, the footing inspection passed with two more piers at the stair landing, and the homeowners have been to the lumber yard. Now they want composite instead of pressure-treated, with a border. That's a material swap, a new lead time and a new price.

Change order

Change order CO-2
Your Deck Co.
Street address, City, ST
Phone · email
License no. (if your trade needs one)
Prepared forMike and Erin DoyleJob address
Job16 x 20 deck with stairs, change order 1
DateDate
ItemQtyUnitRateAmount
Add: two footings at stair landing
Required at the footing inspection on [date]
2each$240.00$480.00
Add: composite decking upgrade, price difference
[Brand, color] in place of pressure-treated 5/4 boards
320sq ft$6.50$2,080.00
Add: picture-frame border, contrasting color72linear ft$14.00$1,008.00
Add: hidden fasteners
Needed for the composite boards
320sq ft$1.25$400.00
Credit: lattice skirting
Owners will skirt it themselves
-48linear ft$18.00-$864.00
Subtotal$3,104.00
Tax (6%)$186.24
Change order total$3,290.24
Reason for change: the building inspector required two more footings at the stair landing. Owners chose composite decking with a picture-frame border on [date] and will install their own skirting.
Composite lead time is [number] days from this signature. Decking install moves from [date] to [date]. Framing stays covered and protected in the meantime.
Composite is covered by the manufacturer's warranty, registered in the owners' name. Our workmanship warranty is unchanged.
Payment: [percent]% of this change order due at signing to order material, balance with the final payment.
Owner: ______________________ Date: ________ Contractor: ______________________ Date: ________
Track every job in Redline

Click any text to change it. Rates and the tax rate are examples, so put in your own. Totals update as you type.

What this template covers

  • A material upgrade written as the price difference per sq ft, not the whole deck again
  • The hidden costs of composite on their own lines: border by the linear foot, hidden fasteners per sq ft
  • Footings the inspector added, by the each, with the inspection date
  • The new lead time, and money up front to order the special material
  • Whose warranty covers the boards and whose covers the work

Doing it in Redline

Decking upgrades go easier when the owners see the choices side by side. On Solo ($29 a month), the quote composer in Money builds good, better and best options on one quote: pressure-treated as is, composite at $6.50 more a foot, PVC at $9 more. Or tell the chat "Doyle change order: 2 footings at $240, composite 320 sq ft at $6.50, border 72 ft at $14, hidden fasteners 320 sq ft at $1.25" and it builds the composite change as a quote on their file, on any plan. Have the chat draft an email that lays out the choices, send it from your Gmail, and let them pick.

Once they've signed this form, have the chat update the job value and, on Solo ($29 a month), invoice the composite deposit by chat as a card pay link. Nothing gets invoiced when they sign; you ask for it. When the boards come in, "move the Doyle decking install to the 22nd" puts it on the calendar. The deck estimate template has the framing and footing lines for the next one.

Show them the upgrade, then price it.

Redline is free to start. Quotes by chat on every plan, good, better and best options in the quote composer on Solo.